Plumbing Services Required for Renovation at Key Biscayne – Miami
Current Bid
Description
Renovation & Remodeling Project in Key Biscayne
A plumbing service is required for a comprehensive renovation and remodeling project at Woodcrest Road in Key Biscayne, Florida. The client is seeking a highly qualified plumbing professional to oversee the installation of new plumbing systems throughout the property. This includes the meticulous planning and execution of the installation process, ensuring all work complies with the latest Florida Building Code and OSHA regulations. The project will encompass the installation of new plumbing fixtures, water heaters, sanitary sewer lines, and vent lines, all designed to meet the specific needs outlined in the provided architectural and engineering plans.
The client has already prepared detailed architectural and engineering blueprints, including specific plumbing requirements such as PVC SCH.40 for sanitary sewers, DWV Copper for fixture drainage arms, and copper for water pipes. The plans also specify the use of full port ball valves and PVC vent lines. Additionally, the installation will require balanced-pressure, thermostatic valves for showers and tubs, which must conform to ASSE and ASME standards, ensuring safe and efficient operation with a maximum temperature setting limited to 120°F. The selected professional will need to thoroughly analyze these blueprints to provide precise quotes and cost estimates, as well as develop a comprehensive installation plan that includes a detailed breakdown of costs for both materials and labor.
This project not only demands technical expertise but also a strong commitment to quality and compliance. The chosen plumbing professional must be a licensed master plumber with relevant certifications and experience in similar renovation and remodeling projects. They will be responsible for obtaining all necessary permits, coordinating with other contractors, and ensuring the site is kept clean and organized throughout the project. The client expects a high level of professionalism and accuracy, with the final plumbing installation meeting the approval of both the architect/engineer and local building authorities. The work must be guaranteed free from defects for a period of one year from the date of the certificate of occupancy, ensuring long-term reliability and satisfaction.
1. Project Overview
This project involves the renovation and remodeling of Residence at Woodcrest Road, Key Biscayne, FL. The scope of work includes the installation of plumbing systems as outlined in the provided blueprints.
2. Project Specifications
- Plumbing Systems: The installation involves new plumbing fixtures, water heaters, sanitary sewer lines, and vent lines. Detailed specifications include:
- Sanitary Sewer: PVC SCH.40
- Fixture Drainage Arms: DWV Copper
- Water Pipe: Copper
- Ball Valves: Full port
- Vent Lines: PVC
- Water Heater: Installation as per provided layout and specifications.
- Shower and Tub Valves: Balanced-pressure, thermostatic, or combination valves conforming to ASSE 1016/ASME A112.1016/CSA B125.16 or ASME A112.18.1/CSA B125.1, with maximum temperature settings limited to 120°F.
3. General Notes
- All work and materials must comply with the Florida Building Code 2023 8th Edition, OSHA, and all applicable local, state, and federal codes.
- The Plumbing Contractor (P.C.) is responsible for obtaining all necessary permits and certificates and for paying associated fees.
4. Timeline
- Project Start Date: In 8 weeks ( 26th of July)
- Key Milestones: Initial site visit and assessment, completion of detailed plumbing plan,final installation, and testing.
5. Budget
The client has allocated an estimated budget range of $40,000 – $60,000 for the plumbing services.
6. Qualifications and Experience
- Licensed Master Plumber.
- Relevant qualifications and certifications in plumbing.
- Experience with similar renovation and remodeling projects.
- Familiarity with local building codes and regulations
7. Contact Information
For further information or to submit quotes, please contact:
- Name: Valeria Cortez
- Email: [email protected] ; [email protected]
- Phone: +1 561-513-4540
8. Submission Requirements
Proposals should include:
- A detailed cost breakdown.
- A timeline for completion.
- References from previous projects.
- Any relevant certifications or licenses.
9. Evaluation Criteria
Proposals will be evaluated based on:
- Cost.
- Experience and qualifications.
- Proposed timeline.
- References and past work quality.
10. Legal and Compliance
- All work must comply with local building codes and regulations.
- The P.C. is responsible for obtaining any necessary permits.